Laserfiche WebLink
February 19,2020 C-1982-056/Foidel Creek Mine TNL <br /> •—' . Ii11�1�nutYill�Ii�nl�s}�1/�I�II� <br /> r <br /> } v s <br /> f <br /> General area of Culvert F-4 (A) <br /> GENERAL MINE PLAN COMPLIANCE: <br /> The stocker coal building construction is progressing with one tube up (photo below). A crew was onsite <br /> working on the construction at the time of inspection. The mining is moving the long wall and not currently <br /> producing. Per the operator mining should resume again in April. <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.032(3),Drainage 4.03.1(4)/4.032(4), Surfacing and Maintenance4.03.1(5) and <br /> (6)/4.032(5) and(6),Reclamation 4.03.1(7)/4.032(7): <br /> Main facilities area was plowed and the mine was working on clearing additional roads from the most <br /> recent snow fall. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> Topsoil piles along the 6MN road appear to be affected by snow plowing activities. The snow had been <br /> pushed up to or onto the topsoil piles in clearing the 6MN road. Any damage to these piles will be assessed once <br /> the piles can be observed after the snow melts latter in the year. Topsoil in the area needs to be stored in a manner <br /> that can be protected. This may include additional markers or barriers or moving the resource to another area. <br /> Number of Partial Inspection this Fiscal Year: 8 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 6 <br />