Laserfiche WebLink
Loader Worksheet Cont'd Task#001 Page 2 of 2 <br /> Total Travel Time: 0.0476 minutes <br /> Total Cycle Time: 0.4726 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 0.53 LCY(heaped) <br /> Bucket Fill Factor: 1.025 Rock-Earth Mixture(100%-105%) 1.025 <br /> Adjusted Capacity: 0.54 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 8200 feet <br /> Source <br /> Altitude Adj: 0.95 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) _ <br /> Net Correction: 0.79 multiplier <br /> Unadjusted Hourly Unit Production: 68.98 LCY/Hour <br /> Adjusted Hourly Unit Production: 54.39 LCY/Hour <br /> Adjusted Hourly Fleet Production: 54.39 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 4.89 Hours <br /> Unit cost: $1.225 /LCY Total job cost: $326 <br /> • <br /> CIRCES Cost Estimating Software <br />