My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-20_INSPECTION - M2009006
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2009006
>
2020-02-20_INSPECTION - M2009006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2020 1:43:08 PM
Creation date
2/20/2020 12:47:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009006
IBM Index Class Name
Inspection
Doc Date
2/20/2020
Doc Name
Returned Mail
From
DRMS
To
Colorado Quarry, LLC
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> Bulldozer Worksheet Cont'd Task#001 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Grade 4 acre pit area to 3H:1V <br /> Site: Meadow Hollow Quarry Permit Action: 1/16/2020 Inspection Permit/Job#: M2009006 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 1/27/2020 County: Larimer Filename: M006-001 <br /> User: AME <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $103.86 NA <br /> Operating Cost/Hour: $82.26 100 <br /> Ripper own. <br /> Cost/Hour: $10.43 NA <br /> Ripper op. Cost/Hour: $4.19 50 <br /> Operator Cost/Hour: $39.98 NA <br /> Total unit Cost/Hour: $240.72 <br /> Total Fleet Cost/Hour: $240.72 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 38,720 <br /> Swell factor: 1.000 <br /> Loose volume: 38,720 LCY <br /> Source of estimated volume: 4 acres x 6 ft high rubble piles <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly 852.6 LCY/hr <br /> production: <br /> Materials consistency description: Loose stockpile 1.2 <br /> Average push -25% <br /> gradient: <br /> Average site altitude: 5,680 feet <br /> Material weight: 2,550 lbs/LCY <br /> Weight description: Sandstone <br /> Job Condition Correction Factor Source <br />
The URL can be used to link to this page
Your browser does not support the video tag.