Laserfiche WebLink
T'.Y Cow <br /> COLORADO DIVISh T R 0 .TION, MINING AND SAFETY <br /> 1313 Sherman Street,1 � 80203 ph(303)866-3567 <br /> "/876 ECS/mac <br /> 11?ICncnOr-m <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET FEB 19 2020 <br /> File No.: M- 1 991 -083 Site Name: UIa Pit DIVISION OE MC M TIN <br /> Custer MINING AND SAFETY <br /> County TR# (DRMS Use onlyl <br /> Permittee: Seifert Enterprises LLC <br /> Operator(If Other than Permittee): same 3 3 <br /> o� <br /> Kent Beach owner/partner <br /> Permittee Representative: - <br /> 0 b <br /> Please provide a brief description of the proposed revision: y co <br /> Revision of Exhibit D Mine Plan to clarify extent of vertical highwalls in the pit during periods <br /> of active mining status, including impact on total bond amount required for this site. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted o <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR,,' m a <br /> the Division may require the submittal of a permit amendment to make the required or desired changes � <br /> 1 to <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type -Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 11 Oc, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 1 IOd, 112d(l, 2 or 3) $1006 ❑ <br />