Laserfiche WebLink
Table 2.05.3(3)-4,Building tory <br /> Building Building Building Concrete Length Width Height Post Mine <br /> Function Construction Foundation Floor (feet) (feet) (feet) Plans <br /> Thickness <br /> Shop Steel Concrete 8-12 in. 77 ft. 52 ft. 40 ft. Remain for <br /> farm support <br /> Washbay 'Open Concrete 8-12 in. 31 ft. 52 ft. N/A Remain for <br /> farm support <br /> Shop Steel Concrete 8-12 in. 37 ft. 10 ft. 12 ft. Remain for <br /> addition farm support <br /> Foreman's Trailer N/A N/A 37 ft. 10 ft. 12 ft. Storage or tow <br /> Office away <br /> Mine Trailer N/A N/A 39 ft. 25 ft. 12 ft. Will revert to <br /> Office residence <br /> Engineer's Residential Concrete N/A 82 ft. 35 ft. 12 ft. Will revert to <br /> Office residence <br /> Meeting Residential Concrete N/A N/A N/A N/A Will revert to <br /> Building residence <br /> Change Trailer N/A N/A 60 ft. 14 ft. 12 ft. Remain for <br /> Room farm support <br /> Training Cinder Block Concrete 4-6 in. 32 ft. 21 ft. 12 ft. Remain for <br /> Buildingfarm support <br /> Warehouse <br /> r en Se Cinder Block Concrete 4-6 in. 90 ft. 24 ft. 12 ft. Remain farm suppor <br /> ort <br /> ort <br /> Warehouse Cinder Block Concrete 4-6 in. 47 ft. 32 ft. 12 ft. Remain for <br /> Enclosed farm support <br /> Engineer's Wood Frame Concrete 4-6 in. 24 ft. 22 ft. 8 ft Will support <br /> Garage residence <br /> ContainerSteel N/A N/A 40 ft. 8 ft. g ft Storage or tow <br /> A away <br /> Container Steel N/A N/A 40 ft. 8 ft. g ft, Storage or tow <br /> B away <br /> Container Steel N/A N/A 20 ft. 8 ft, g ft Storage or tow <br /> C away <br /> Container Steel N/A N/A 20 ft. 8 ft. g ft Storage or tow <br /> D away <br /> Cargo Steel N/A N/A 40 ft. 8 ft. g ft Storage or tow <br /> Trailer away <br /> 2. Waste Water <br /> Sewage from the existing buildings will be disposed of through an existing sanitary sewer lines <br /> discharging into a sewer main on Lincoln Street which is owned by the Nucla Sanitary District. <br /> Waste water from the equipment wash will be run through a sediment trap and an oil water <br /> separator and discharged to Pond 018 via a natural drainage. <br /> Section 2.05.3(3) Page 29 January 2020 (MR-114) <br />