My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-11_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-02-11_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:12:48 PM
Creation date
2/12/2020 6:58:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
2/11/2020
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Trapper Mining Inc
Type & Sequence
TR124
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5of18 <br /> Trapper TR124 <br /> SCRAPER TEAM WORK <br /> Task description: Replace Topsoil on N Pit <br /> Site: Trapper Mine Permit Action: TR124 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: N14 State: Colorado Abbreviation: None <br /> Date: 2/10/2020 County: Moffat Filename: CO10-N14 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/ ush- ull <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D IOT- IOSU <br /> -Dump Area: Cat DIOT- IOSU <br /> Road Maintenance-Motor Grader: CAT 16M <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support E ui ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 50 50 50 50 <br /> Ownership cost/hour: $174.06 NA $140.61 $140.61 $82.71 $9.27 <br /> Operating cost/hour: $190.35 NA $67.67 $67.67 $35.04 $8.87 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Ripper op. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $30.86 NA $41.24 $41.24 $28.52 $21.09 <br /> Unit Subtotals: $395.26 NA $249.52 $249.52 $146.27 $39.23 <br /> Number of Units: 8 0 1 1 1 1 <br /> Group Subtotals: Work: $3,162.08 Support: $499.04 Maint: $185.50 <br /> Total work team cost/hour: $3,846.62 <br /> MATERIAL QUANTITIES <br /> Initial volume: 336,429 CCY Swell factor: 1.000 <br /> Loose volume: 336,429 LCY <br /> Source of estimated volume: TR124 Application <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,550 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Earth-Dry packed Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 32.00 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.