Laserfiche WebLink
Monitoring reclamation on an ongoing basis will allow minor revisions to assure efficient and <br /> successful reclamation. The Operator plans to use the local NRCS office to assist in determining <br /> the ability of the reclaimed land to control erosion. If minor changes or modifications are needed <br /> to the seeding and reclamation plan,revision plans will be submitted to the Division, as required. <br /> It is hoped that the Division will provide assistance in evaluating the success of ongoing <br /> reclamation processes. All areas disturbed and reclaimed and any other important items <br /> regarding reclamation will be submitted in the required annual reports to the Division. <br /> Throughout the process,weed mitigation will occur through mechanical removal. If there are <br /> issues that arise regarding noxious weed control, Fremont Paving will contact the Lincoln <br /> County Noxious Weed Coordinator for guidance. <br /> 9. Reclamation Bond <br /> The bond for the site will be based upon$2,500 per acre. The site will have 20.0 acres of <br /> disturbance. Since a fraction of an acre is counted a whole acre by the Division,the bond will be <br /> 20.0 acres x$2,500.00 per acre= $50,500.00. <br />