The following list is the best estimate of equipment that will be used onsite throughout the mine <br /> life: <br /> - 1-2 Front end loaders <br /> - crushing and screening plant <br /> - 1-2 D-10 Bulldozer <br /> - 1 4000 gallon water truck <br /> - off-highway road haul trucks(number will depend upon production needs) <br /> - 15 and 24 ton on-road haul trucks(number will depend upon production needs) <br /> A portable asphalt plant will be located in the southwestern corner of the site. Material crushed <br /> and stockpiled on site will be used for asphalt production. Asphalt production may occur only <br /> during the warm season months of April through October. Components associated with the <br /> portable asphalt plant include: <br /> - Liquid asphalt storage <br /> - Aggregate feed bins <br /> - Mixer <br /> - Conveyors <br /> - Lime silo <br /> - Truck loading equipment <br /> - Power supply and distribution <br /> All fuel tanks will have secondary containment. Tanks will be either double walled or located <br /> within bermed or lined areas that have over 110%of the volume of the largest stored tank. Fuel <br /> tanks will be located in the processing area; see the Mining Map. Several hazardous materials <br /> will be stored and used onsite throughout the project. These materials include products that are <br /> associated with diesel motors and products associated with asphalt production. <br /> Unimproved on site roads are temporary and will change as mining progresses to the east. <br /> Support equipment will come to the site on an as-needed basis.Night mining activity may occur <br />