Laserfiche WebLink
EXHIBIT E RECLAMATION PLAN (coNT) <br /> Optional Reclamation Plans <br /> Note that all changes connected with the following optional <br /> plans will take place within the permitted boundaries, therefore <br /> not affecting (increasing) the overall acreage of the permitted <br /> area and guaranteeing the allowed use of the Technical Revision <br /> process for these changes . <br /> RESERVOIR AREAS <br /> We are submitting two options for a final configuration of the <br /> reservoir areas . These are based on the current and future status <br /> of various oil/gas facilities located in the permit area. <br /> Option A - The reservoir configurations for Option A are show <br /> on the large map on MAP EXHIBIT F - RECLAMATION PLAN MAP - OPTION A and <br /> the areas are shown on the Reclamation timetable for Option A. <br /> Option B - The reservoir configurations under Option B are <br /> shown on MAP EXHIBIT F - RECLAMATION PLAN MAP - OPTION B and the areas <br /> are shown on the Reclamation timetable for Option B. In general, <br /> the optional changes in Option B could be caused by oil and gas <br /> facility changes, other utility and ROW changes, and changes by the <br /> landowner. Changes by the landowners could include their construc- <br /> tion of developed water storage facilities prior to acreage release <br /> in a reservoir phase, or transforming a backfill phase into a <br /> wetland area, for wetland banking by the landowner. If any options <br /> of Option B are chosen, L.G. Everist will submit a Technical <br /> Revision to incorporate the changes . <br /> The methods used to reclaim the reservoirs will be the same <br /> for both options as previously discussed. The difference may be an <br /> increase/decrease in the volume of developed water storage and an <br /> increase/decrease in the amount of revegetation necessary. <br /> We do not know when Mining Option B or Reclamation Option B or <br /> some part (s) of either or both will be implemented, but we are <br /> including these optional plans to increase the flexibility of this <br /> permit and account for inevitable changes when mining the site . As <br /> mentioned previously, whenever any part (s) of the Option B plans <br /> become feasible, we will file a Technical Revision (s) to the <br /> Division to provide revised Mining and/or Reclamation Map (s) that <br /> will show the changes . The Technical Revision (s) will discuss any <br /> changes needed to implement the optional changes, including a <br /> discussion on changes in disturbed areas, slurry wall lengths and <br /> revegetated areas . <br /> L.G. Everist, Inc. Ragsdale Reservoirs February 6,2020 <br /> 18 <br />