Laserfiche WebLink
EXHIBIT D MINING PLAN (coNT) <br /> Note, the floor of the excavation is generally flat and the slopes <br /> into the reservoirs are 3h to lv where mining is complete on the <br /> perimeter. The excess overburden and plant-generated fines, have <br /> partially backfilled Phase lA and 2A. Phase 1 has been reclaimed <br /> and is ready for final development by the landowners . Also, rec- <br /> lamation is running concurrent with mining to reduce the amount of <br /> disturbance at anyone-time and reclamation is following Option A. <br /> Please refer to the MINING TIMETABLES for the estimated acre- <br /> age of each area associated with the mining part of this operation. <br /> Mining equipment may include but is not limited to, front-end <br /> loaders, scrapers, excavators, a drag line, dozers, off-road haul <br /> trucks, dump trucks and a water truck. Processing equipment may <br /> include but is not limited to conveyors, crushers and screen <br /> plants . A scale and scale house may be built at the mine during <br /> its life . <br /> As much as possible, the surface drainage will be maintained <br /> in the same direction as it now exists . The proposed sloping plan <br /> for the excavated area should eliminate any concerns of erosion <br /> occurring from the site . <br /> Most of the water used on site will be for dust control used <br /> on haul roads or with sand and gravel processing. Please refer to <br /> EXHIBIT G - WATER for the discussion of how water will be used at the <br /> site, the estimated yearly needs and the source of said water. <br /> The 2 large irrigation ditches that cross the site and the <br /> Cannon return flow ditch will not be impacted by the mining opera- <br /> tion. All interior pit slopes will be maintained with a pit-ward <br /> attitude so that historic drainage patterns can be maintained. <br /> This same slope management plan will prevent any offsite slides or <br /> other disruptions . Isolation berms or ditches will be constructed <br /> around the mine as needed to prevent stormwater from contacting the <br /> disturbed areas . All stormwater contacting the disturbed area will <br /> be retained on site and allowed to evaporate or soak into the <br /> underlying gravel . <br /> No U.S . Army Corps of Engineers, 404 permit is necessary, as <br /> mining will not impact waters of the U.S . While there are ditches <br /> and a non-determined wetland area between them, these areas will <br /> not be disturbed by mining or reclamation. <br /> MINING TIMETABLES <br /> This estimated mining timetable is based on an average year, <br /> and L.G. Everist expects some years to vary widely from the aver- <br /> age . If there are changes in the mining timetable, we will discuss <br /> the reasons for the change in the annual report that follows the <br /> change and modify it at that time if needed. <br /> L.G. Everist, Inc. Ragsdale Reservoirs February 6,2020 <br /> 13 <br />