My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-07_REVISION - M1977211 (15)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977211
>
2020-02-07_REVISION - M1977211 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 3:36:02 AM
Creation date
2/10/2020 8:31:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Revision
Doc Date
2/7/2020
Doc Name
Adequacy Review Response
From
Continental Materials Corp.
To
DRMS
Type & Sequence
AM4
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JNTINENTAL MATERIALS CORPORATION <br /> , 2020 RFc� <br /> F �VFO <br /> Responses to Third Adequacy Review and Comments FB Q? <br /> Permit Amendment 4, Pikeview Quarry, M-1977-211 ���5�0/�/�F ��?o <br /> s �•�M1k1 Gq p'eC44 <br /> Dear Mr. Cazier: �f? .�14Fcry��N <br /> Continental Materials Corporation (CMC) is pleased to submit responses to the third adequacy review of <br /> the 112 permit amendment application for the Applicant's Pikeview Quarry operation.The revised text <br /> has been highlighted for your convenience. Several of the responses to previous adequacy comments <br /> were deemed "adequate" by DRMS, and only the outstanding and new comments have responses. <br /> The CIVIC team feels that this adequacy review includes several requests that exceed the requirements <br /> established in the rules and regulations applicable to a construction materials permit.These requests <br /> ask for information that would be part of a construction-level design but are unnecessarily specific for <br /> reviewing or preparing a permit-level design. CIVIC, like the Division, hopes that the permitting process <br /> can proceed without further delays, and therefore CIVIC is including the specifications requested by <br /> DRMS, including information identified in the untimely comments submitted by third parties. <br /> We assume that DRMS and the objecting parties share CMC's project goals in reclaiming the quarry, and <br /> these include: <br /> • Safely implementing the reclamation plan <br /> • Leaving a stable, vegetated slope <br /> • Minimizing the remaining highwalls <br /> • Minimizing new disturbances <br /> • Minimizing visibility of the reclaimed quarry to the City of Colorado Springs, and <br /> These project goals are better met with the proposed reclamation plan than in the currently approved <br /> plan. <br /> Please do not hesitate to contact me or our Stantec consultant, Paul Kos, if you have any questions. <br /> Sincerely, <br /> Jerald Schnabel <br /> Continental Materials Corporation <br /> Continental Materials Corporation, 440 South LaSalle,Suite 3100, Chicago, IL 60605-5020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.