Laserfiche WebLink
Chloride Portal .r. <br /> Reclamation Map <br /> Permanent secured closure on octal. Ij <br /> Waste rock pad and slopes seeded. <br /> Roadway will remain passable. f <br /> li <br /> Upper inlet and lower outlet, and , ,' BURIED PIPE IN <br /> buried drainage bypass piped, if _ f �;; • WASTE ROCK <br /> ET <br /> ! present, will remain in place. [ "'"' ,. <br /> Contour interval 20 ft. <br /> BURIED PIPE OUTLET - , <br /> ry <br /> I <br /> O <br /> � 2 v <br /> `i <br /> Legend <br /> ORE STOCKPILES AND MINING-RELATED BUILDINGS TO BE REMOVED. <br /> ROADWAYS AND STORMWATER CONTROLS WILL REMAIN IN PLACE. <br /> RECLAMATION OF OTHER DISTURBED AREAS WILL INCLUDE SEEDING <br /> AND NATURAL SEEDLING TREE GERMINATION AND ESTABLISHMENT. <br /> CHLORIDE PORTAL RECLAMATION MAP Map prepared by Bob Oswald, High Country Consulting Services LLC .✓U� ��a�t <br /> EXHIBIT E.8 on (date) <br />