Laserfiche WebLink
.ie <br /> Pill ILL, <br /> LAI <br /> ilk <br /> ii <br /> Volunteer Shaft <br /> Reclamation Mats i �•� , <br /> p <br /> Permanent secured closure on shaft. <br /> VVaste rock pad and slopes seeded. <br /> Roadway will remain passable. , <br /> Contour interval 20 ft. ;' <br /> A. <br /> PRIVATE RD r . '� ► <br /> A - .. <br /> Ilk <br /> u <br /> ORE STOCKPILES AND MINING-RELATED BUILDINGS TO BE REMOVED. <br /> ROADWAYS AND STORMWATER CONTROLS WILL REMAIN IN PLACE. <br /> RECLAMATION OF OTHER DISTURBED AREAS WILL INCLUDE SEEDING <br /> AND NATURAL SEEDLING TREE GERMINATION AND ESTABLISHMENT. <br /> VOLUNTEER SHAFT RECLAMATION MAP <br /> Map prepared by Bob Oswald, High Country Consulting Services LLC ✓ ✓'Lli�t%' <br /> EXHIBIT E.9 on i/Z zA0 (date) <br />