Laserfiche WebLink
7. It appears that Exhibit 7-14M has been removed from Exhibit 7,Table of Contents and its removeal <br /> would be consistent with the exercise of this revision.However,Exhibit 7-14M has was not requested <br /> for removal from the Colowyo PAP as requested in Colowyo's Change Sheet for Revisions with TR- <br /> 135. Please provide confirmation that is what Colowyo is requested or provide an updated Exhibit 7, <br /> Table of Contents to include Exhibit 7-14M. <br /> 8. When reviewing proposed Exhibit 7,Item 14,Table 1 on Page Exh. 7-14-7, Sections 19+55 through <br /> 77+00 were removed for the East Taylor Ditch along with the entirety of the Buckskin Draw Ditch. <br /> Please provide an explanation for removing them from proposed Exhibit 7,Item 14,Table 1 as neither <br /> has been Phase III released or removed from Colowyo's reclamation plan or re-include them into the <br /> table. <br /> 9. In proposed Exhibit 7,Item 14E,Page Exh.7-14-2,it states that the profile from Streeter and Buckskin <br /> Draw Ditch can be found on Map 33. Buckskin Draw Ditch profile is found on Map 33A. Please <br /> provide and updated reference for the Buckskin Draw Ditch profile. <br /> 10. When reviewing proposed Exhibit 7,Item 14E,it appears to the Division that there is an error in the <br /> network structuring in the SedCAD model.As proposed,Structure 10(Streeter Ditch 45+00 to 80+00) <br /> flows into Structure 6 (Streeter Ditch 10+00 to 25+00) and Structure 9 (Stoker Ditch) flows into <br /> Structure 10.It appears to the Division that Structure 10 should connect into Structure 7(Streeter Ditch <br /> 25+00 to 45+00)and Structure 9 should connect into Structure I I (Streeter DitchOn pro 80+00 to SD- <br /> I). Please provide the Division an explanation on the current structure networking or an updated <br /> SedCAD mode for proposed Exhibit 7,Item 14E. <br /> 11. On proposed Volume 2D, Exhibit 7, Page 10, Table 6, the total watershed to the Streeter Pond has <br /> been reduced by 3.6 acres.Please provide to the Division an explanation to why the watershed to the <br /> Streeter Pond was reduced. <br /> 12. When reviewing proposed Exhibit 7,Item 14SP,it appears to the Division that there is the same error <br /> in the network structuring of the SedCAD model noted in Adequacy Item 10 of this review letter exists <br /> for the noted exhibit in this item. Please refer to Adequacy Item 10 of this review letter but for the <br /> proposed Exhibit 7,Item 14SP. <br /> 13. For all the proposed List of Maps,Maps 4B and 4C remain referenced. As requested in Colowyo's <br /> Change Sheet for Revisions, Maps 4B and 4C have been requested for removal. Please provide an <br /> updated List of Maps to remove reference to Maps 4B and 4C. <br /> 14. For proposed Volume 12,List of Maps,Page viii,Maps 4B and 4C remain referenced. Additionally, <br /> there appears to be a page numbering alignment issue between the propose Volume 12 Table of <br /> Contents (including List of Maps, Page viii — x) and what the Division has internally. The Division <br /> respectfully requests for an updated Volume 12,Table of Contents,including updated map references <br /> for the List of Maps portion proposed under TR-135. <br /> 15. On proposed Volume 12, Rule 2, Page 43 refers to Map 4 — Sheet 1. Please provide an updated <br /> proposed Volume 12,Rule 2,Page 43 with a corrected map reference. <br /> 16. Under Section 2.05.4(2)(a)on proposed Volume 12,Rule 2,Page 74 it references Map 29A which has <br /> been requested for removal per Colowyo's Change Sheet for Revisions. Please provide an updated <br />