Laserfiche WebLink
� Q Processing Area Berm <br /> o <_9 feet stormwater and <br /> o 6-12 seeded sediment sump <br /> topsoil cap <br /> r0 3N:��1 3ht.7 V <br /> Processing Area surface <br /> topsoil or overburden <br /> Figure 3. Schematic typical cross-section of the Bradford Mesa processing area. <br /> C7 <br />