Laserfiche WebLink
-4- <br /> 12. Primary future Post-minin land use check one): <br /> Cropland(CR) Pastureland(PL) F] General Agriculture(GA) <br /> ID Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> �✓ Developed Water Resources(WR) Solid Waste Disposal(VD) <br /> 13. Primary resent land use check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> slurry wall and dry mine using excavator, haul truck, loader and conveyor belts <br /> 15. On Site Processing: —0 Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g. truck/shovel): <br /> processing will occur on the main Shores Gravel mine site. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> NA <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> Additional land to the north of the existing Shores Gravel mine to be used to convey material to <br /> the Shores Gravel Mine to produce crushed rock, top soil, sand and gravel and building <br /> FnateFla'S. <br />