My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-05_REVISION - M1998013 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998013
>
2020-02-05_REVISION - M1998013 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 7:06:35 AM
Creation date
2/5/2020 2:32:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
REVISION
Doc Date
2/5/2020
Doc Name
Request For Amendment To Permit
From
Bestway Concrete Co.
To
DRMS
Type & Sequence
AM3
Email Name
ECS
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E - RECLAMATION PLAN <br /> This information provided in this Exhibit is intended to satisfy the requirements outlined in Section <br /> 6.4.5 of the Colorado Mined Land Reclamation Board Construction Material Rules and <br /> Regulations: The proposed mining and reclamation plan focuses on minimizing the ecological <br /> impacts of mining, minimizing the length of time of impact, and maximizing long-term benefits. <br /> The mine is currently: <br /> Main Shores Mine Area: <br /> Pond A—slurry lined and reclaimed as water storage. Slurry Wall has been <br /> approved, mining is not complete and Pond A will be the final phase of the mining for <br /> the entire site, 6 to 8 years out. <br /> Pond B—slurry lined and reclaimed as water storage. Slurry Wall has been approved <br /> and water is currently being stored. <br /> Pond C—slurry lined and reclaimed as water storage. Slurry Wall has been approved <br /> and water is currently being stored. <br /> Pond D—slurry lined and reclaimed as water storage. Slurry Wall has been approved <br /> and water is currently being stored. <br /> Vogl Amended Area: <br /> Cell 1 —wet mined and reclaimed as uplands to native grades. <br /> Cell 2a—slurry lined and dry mined, reclaimed as water storage. <br /> Cell 2b -wet mined and reclaimed as uplands to native grades. <br /> Cell 3—slurry lined and dry mined, reclaimed as water storage. <br /> (a) A description of the type(s)of reclamation the Operator proposes to achieve in the <br /> reclamation of the affected land, why each was chosen, the amount of acreage <br /> accorded to each, and a general discussion of methods of reclamation as related to <br /> the mechanics of earthmoving; <br /> The mined area will be reclaimed to existing grade. Refer to Exhibit F for the acreages <br /> and additional details. <br /> EarthmovinQ <br /> The topsoil will be replaced by a scraper and generally graded with a blade. All grading <br /> will be done in a manner that controls erosion and siltation of the affected lands, to protect <br /> areas outside the affected land from slides and other damage. In addition, all backfilling <br /> and grading will be completed as soon as feasible after the mining process. All disturbed <br /> areas will be regraded and smoothed to a finished grade that is suitable for revegetation or <br /> the final land use. <br /> As noted previously, the area will be reclaimed as mining commences. Finish grading, <br /> topsoil placement and seeding will occur once the resource is completely removed. A <br /> typical cross-section of the shoreline is included on the Reclamation Plan Map. <br /> Bestway Concrete&Aggregates—Vogl Amendment-Shores Mine—MLRB 112 Permit Application <br /> Exhibit E-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.