My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-05_REVISION - M1999005
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999005
>
2020-02-05_REVISION - M1999005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:17 PM
Creation date
2/5/2020 1:30:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999005
IBM Index Class Name
REVISION
Doc Date
2/5/2020
Doc Name
Request for Technical Revision
From
All Rite Paving & Redi Mix
To
DRMS
Type & Sequence
TR3
Email Name
DC1
JLE
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of colo <br /> G -$ COLORADO DIS TRO3 [ATION, MINING AND SAFETY <br /> �8 " 1313 Sherman S - ido 80203 ph(303)866-3567 <br /> Dclfjle RECEIVED <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET LB 0 5 2020 <br /> File No.: M- 1999-005 Site Name:North River Pit <br /> DIVISION OFRECLAMATION <br /> Otero MINING AND SAFETY <br /> County TR# (DRMS Use only) <br /> Permittee:All Rite Paving and Redi Mix, Incco E <br /> 49 <br /> 5 .0 <br /> Operator(If Other than Permittee): <br /> Jodi Schreiber <br /> Permittee Representative: a <br /> O <br /> tin <br /> Please provide a brief description of the proposed revision: y <br /> All Rite Paving and Redi Mix will reclaim the scale area to a 3H:1V and use the approved <br /> seed mix for revegetation when all site activities are complete. Additionally, a weed plan has <br /> been attached and is requested to be added to the permit. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or G <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted o <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, n .'xi <br /> the Division may require the submittal of a permit amendment to make the required or desired changes y W <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 ✓ <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 El <br />
The URL can be used to link to this page
Your browser does not support the video tag.