My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-03_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2020-02-03_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2020 10:58:22 AM
Creation date
2/3/2020 2:45:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
2/3/2020
Doc Name
Request for Technical Revision
From
Sunnyside Gold Corp.
To
DRMS
Email Name
LJW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
st cow <br /> 4MINING AND SAFETY <br /> " /��� COLORADO DIS frATION, <br /> 1313 Sherman SiTR3 gado 80203 ph(303)866-3567 <br /> rs7s <br /> smossommom <br /> REQUEST FOR�..y�__ .LJW/thm ION (TR) COVER SMELT <br /> File No.: M- M-1977-378 Site Name: Mayflower TP4 EIVED <br /> San Juan FEB o3 9on <br /> County TR# �(DRMS s M1y) <br /> Permittee: <br /> Sunnyside Gold Corporation 71"W 4f44:4-tiai <br /> (431 <br /> 611 <br /> Operator(If Other than Permittee): 141r../ <br /> Permittee Representative: Pat Maley, Director, Environment <br /> Please provide a brief description of the proposed revision: Sunnyside Gold Corporation requests a o <br /> Technical Revision to its permit M-1977-378, which covers Mayflower Tailing Pond 4 (TP4). ;$ <o <br /> This revision would incorporate into the permit 14 monitor wells and 7 piezometers, which are <br /> being monitored pursuant to an Administrative Order on Consent with EPA. The wells and <br /> piezometers are considered permanent. A Google map and well descriptions are attached. co <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the C o I-1 <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to g <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type -Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110e, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 V <br /> 110d, 112d(1, 2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.