Laserfiche WebLink
1 0 4: .„ 'le,,. <br /> 1 A It <br /> 4-0-11 <br /> .4k. r <br /> L., <br /> Placement of fill material west of bench road. <br /> Wednesday 1/29/20: <br /> Ames continued cut/fill operations in Zone 2, material was hauled off of the zone.2 slope and placed directly west <br /> of the bench road. Ground Engineering was onsite for observation of fill placement and to perform compaction <br /> testing. Compaction tests are passing per the soils report. <br />