My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-31_PERMIT FILE - M2020008
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020008
>
2020-01-31_PERMIT FILE - M2020008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 8:00:08 AM
Creation date
1/31/2020 12:17:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020008
IBM Index Class Name
PERMIT FILE
Doc Date
1/31/2020
Doc Name
Application
From
Scott Contracting Inc.
To
DRMS
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit #1 January 2020 <br /> Table 1. Estimated Mining Timetable <br /> Estimated <br /> Phase/Stage Anticipated Estimated Duration Depth/Thickness Type of <br /> Start (feet)1 Overburden <br /> Clay and silt; about <br /> Phase 1 SiteJune—July 2020 Estimated 6" 6" of topsoil, <br /> Development and May 2020 medium stiff, <br /> Grading (1-2 months) across site slightly moist, <br /> brown <br /> No additional <br /> Phase 2 Mining May 2020 June—August 2020 overburden will be <br /> Preparation (2-3 months) removed during this <br /> phase <br /> Phase 3 Mining July 2020 July 2020—December 2026 <br /> 17 feet—22 feet Varies <br /> Extraction (7 years) <br /> See Boring 3. <br /> Remove estimated <br /> 5.5 feet to 6 feet of <br /> Phase 3/Stage 1 July 2020 July 2020—July 2021 20 feet clay and silt; gravel <br /> layer estimated at 7 <br /> feet to 27 feet <br /> below surface. <br /> See Boring 4. <br /> Remove estimated <br /> 6" of clay and silt; <br /> Phase 3/Stage 2 July 2021 July 2021 —July 2022 21 feet gravel layer <br /> estimated at 1 foot <br /> to 22 feet below <br /> surface. <br /> See Boring 5. <br /> Remove estimated <br /> 2.5 to 3 feet of clay <br /> Phase 3/Stage 3 July 2022 July 2022—July 2023 22 feet and silt; gravel <br /> layer estimated at 3 <br /> feet to 25 feet <br /> below surface. <br /> See Boring 5. <br /> Remove estimated <br /> 2.5 to 3 feet of clay <br /> Phase 3/Stage 4 July 2023 July 2023—July 2024 22 feet and silt; gravel <br /> layer estimated at 3 <br /> feet to 25 feet <br /> below surface. <br /> See Boring 1. <br /> Remove estimated <br /> 2.5 to 3 feet of clay <br /> Phase 3/Stage 5 July 2024 July 2024—July 2025 17 feet and silt; gravel <br /> layer estimated at 3 <br /> feet to 20 feet <br /> below surface. <br /> Phase 4 July 2025 July 2025— December 2026 Not Applicable Not Applicable <br /> (Reclamation) <br /> 1 The depths and thicknesses are estimated and based upon the nearest exploratory boring <br /> logs included in Attachment A. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.