Laserfiche WebLink
Rifle Gravel Pit #1 January 2020 <br /> 5.2.3.1 Stockpiling and Overburden Handling <br /> This phase of the project will include stockpiling of material for screening, washing and <br /> crushing processes. Figure 9 depicts the approximate locations of these stockpiles during <br /> each stage. <br /> 16 <br />