Laserfiche WebLink
Rifle Gravel Pit #1 January 2020 <br /> 5.2.2.2 Water Handling and Dewatering 15 <br /> 5.2.2.3 Schedule of Operations 15 <br /> 5.2.2.4 Explosives 15 <br /> 5.2.3 Mining Extraction (Phase 3— in 5 Stages) 15 <br /> 5.2.3.1 Stockpiling and Overburden Handling 16 <br /> 5.2.3.2 Water Handling and Dewatering 18 <br /> 5.2.3.3 Schedule of Operations 18 <br /> 5.2.4 Reclamation (Phase 4) 18 <br /> 5.3 Mining Timetable 18 <br /> 6.0 Exhibit E — Reclamation Plan 20 <br /> 6.1 Description and Types of Reclamation 20 <br /> 6.2 Post-Mining Land Use 20 <br /> 6.3 Implementation of the Reclamation Plan 20 <br /> 6.3.1 Topsoil Segregation, Preservation, and Replacement 20 <br /> 6.3.2 Final Grading 21 <br /> 6.3.3 Seeding 21 <br /> 6.3.3.1 Temporary Seed Mix 21 <br /> 6.3.3.2 Long-Term/Permanent Seed Mix 21 <br /> 6.3.4 Fertilization 22 <br /> 6.3.5 Revegetation 22 <br /> 6.3.6 Topsoiling 22 <br /> 6.4 Revegetation Success Criteria 22 <br /> 6.5 Noxious Weed Control 22 <br /> 6.6 Reclamation Plan Schedule 23 <br /> 6.6.1 Previously Disturbed/Unnecessary Areas 23 <br /> 6.6.2 Active Mining Areas 23 <br /> 6.7 Monitoring Reclamation Success 23 <br /> 7.0 Exhibit F — Reclamation Plan Map 24 <br /> 8.0 Exhibit G — Water Information 26 <br /> 8.1 Aquifers 26 <br /> 8.2 Groundwater 26 <br /> 8.3 Surface Water 27 <br /> 8.4 Water Management 27 <br /> 8.5 Project Water Requirements 27 <br /> 8.5.1 Water Requirements During Mining Phase 27 <br /> 8.5.2 Water Lost with Mined Aggregate 27 <br /> 8.5.3 Water Used for Dust Control 28 <br /> 8.5.4 Water Lost Due to Evaporation During Dewatering 28 <br /> iii <br />