My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-30_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2020-01-30_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 4:57:42 PM
Creation date
1/30/2020 11:01:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
1/30/2020
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company LP
Inspection Date
1/28/2020
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection R -Roads <br /> N -Availability of Records N -Reclamation Success <br /> R -Backfill& Grading N -Revegetation <br /> R -Excess Spoil and Dev. Waste N - Subsidence <br /> R -Explosives N - Slides and Other Damage <br /> R -Fish&Wildlife Y - Support Facilities On-site <br /> R -Hydrologic Balance Y - Signs and Markers <br /> R - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> N -Processing Waste Y -Topsoil <br /> COMMENTS <br /> This was a partial inspection of the Colowyo Mine conducted by Zach Trujillo of Colorado Division of Reclamation, <br /> Mining and Safety(DRMS)on January 28,2019. Tony Tennyson representing Tri-State Generation and <br /> Transmission Association(Tri-State) and Tom Fry representing Colowyo Coal Company(Colowyo) accompained <br /> the inspection. The weather for inspection was cloudy with snow covered ground conditions.Temperature during the <br /> inspection was around fifteen degrees fahrenheit. Due to snowy conditions, access around the site was exteremly <br /> limited. <br /> BACKFILL and GRADING—Rule 4.14 <br /> Contemporaneous Reclamation 4.14.1; Approximate Original Contour 4.14.2; Highwall Elimination 4.14.1(2)(f); <br /> Steep Slopes 4.14.2,4.27; Handling of Acid and Toxic Materials 4.14.3; Stabilization of Rills and Gullies 4.14.6: <br /> Contemporaneous backfilling continues within the South Taylor Pit as mining progresses to the west. Spoil is being <br /> placed by dragline or transported and compacted by haul trucks. <br /> No grading activities were observed at the time of the inspection due to weather conditions. <br /> South Taylor Backfill. <br /> EXCESS SPOIL and DEVELOPMENT WASTE—Rule 4.09 <br /> Placement; Drainage Control; Surface Stabilization: <br />
The URL can be used to link to this page
Your browser does not support the video tag.