Laserfiche WebLink
BULLDOZER RIPPING WORK <br />Task description: Rip Lincoln Street Haul Road <br />Site: New Horizon Mine Permit Action: RN7 <br />PROJECT IDENTIFICATION <br />Task #: 059 State: Colorado <br />Date: 12/28/2017 County: Montrose <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D11T - 11U <br />Ripper Attachment: 1 -Shank Ripper <br />Page 85 of 135 <br />Permit/Job#: C1981008 <br />Abbreviation: None <br />Filename: C008-059 <br />Horsepower: 850 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />NA <br />feet/second <br />Area: <br />Utilization % <br />Ownership Cost/Hour: <br />$226.13 <br />NA <br />Operating Cost/Hour: <br />$183.90 <br />100 <br />Ripper Ownership Cost/Hour: <br />$21.79 <br />NA <br />Ripper Operating Cost/Hour: <br />$11.30 <br />100 <br />Operator Cost/HOUr: <br />$41.85 <br />NA <br />Total Unit Cost/Hour: <br />$484.97 <br />acres/hour <br />Total Fleet Cost/Hour: <br />$484.97 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA <br />Area: 1.13 acres Rip Depth (ft): 3.00 <br />Source of estimated quantity: Map 2.05.3(3; <br />HOURLY PRODUCTION <br />Seismic: <br />BCY NA <br />Volume: 5,469 BCY or CCY <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />5.29 <br />mph <br />Average Ripping Width: <br />7.94 <br />degrees <br />Average Ripping Length: <br />200.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.867 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.867 <br />Acres/hr <br />Site Altitude: <br />5,000 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.72 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.72 <br />Acres/hr <br />CIRCES Cost Estimating Software <br />