Laserfiche WebLink
Task description: <br />Site: New Horizon Mine <br />BULLDOZER WORK <br />diversion/collection ditches <br />Permit Action: RN7 <br />PROJECT IDENTIFICATION <br />Task #: 057 State: <br />Date: 12/28/2017 County: <br />User: JDM <br />Colorado <br />Montrose <br />Page 79 of 135 <br />Permit/Job#: C1981008 <br />Abbreviation: None <br />Filename: C008-057 <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D3K XL - 3P <br />Horsepower: <br />74 <br />Blade Type: <br />Power Angle Tilt <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$17.81 <br />Utilization % <br />NA <br />$18.68 <br />100 <br />$2.03 <br />NA <br />$1.81 <br />100 <br />$41.85 <br />NA <br />$82.18 <br />$82.18 <br />MATERIAL QUANTITIES <br />Initial Volume: 12,953 <br />Swell factor: 1.165 <br />Loose volume: 15,090 LCY <br />Source of estimated volume: Length from map 2.05.3-1, X -sec from Sec 2.05.3 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />169.6 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,700 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />CIRCES Cost Estimating Software <br />