Laserfiche WebLink
Page 69 of 135 <br />SCRAPER TEAM WORK <br />Task description: Replace topsoil on Pond 010 <br />Site: New Horizon Mine Permit Action: RN7 Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 52B State: Colorado Abbreviation: None <br />Date: 12/28/2017 County: Montrose Filename: C008 -52B <br />User: JDM <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT <br />-Scraper: <br />-Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cnet Rrenkdnwn- <br />Ccraner Wnrk Team <br />COSTShift basis: leer day <br />.auipment Description <br />Cat 631G <br />Cat D9T - 9SU <br />NA <br />NA <br />NA <br />NA <br />Sunnnrt F.nninment <br />Maintenance Eauinment <br />Total work team cost/hour: $706.01 <br />MATERIAL OUANTITIES <br />Initial volume: 4,200 CCY Swell factor: 1.100 <br />Loose volume: 4,620 LCY <br />Source of estimated volume: 1.42 acres, 22" depth <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$98.72 <br />$100.59 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$108.19 <br />$87.23 <br />NA <br />NA <br />NA <br />NA <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$31.26 <br />$41.85 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$238.17 <br />$229.67 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$706.01 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $706.01 <br />MATERIAL OUANTITIES <br />Initial volume: 4,200 CCY Swell factor: 1.100 <br />Loose volume: 4,620 LCY <br />Source of estimated volume: 1.42 acres, 22" depth <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,100 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />User Provided <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />38.86 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />