Laserfiche WebLink
Page 65 of 135 <br />SCRAPER TEAM WORK <br />Task description: Replace topsoil on Pond 009 <br />Site: New Horizon Mine Permit Action: RN7 Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 51B State: Colorado <br />Date: 12/28/2017 County: Montrose <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 631G <br />-Dozer: Cat 139T - 9SU <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C008 -51B <br />COSTShift basis: 1 ver day <br />ipti <br />("act RreAkdawn- Rcrnner Wnrk Team Snnnnrt Fnninment Maintenance Enuinment <br />Total work team cost/hour: $706.01 <br />MATERIAL OUANTITIES <br />Initial volume: 3,017 CCY Swell factor: 1.100 <br />Loose volume: 3,319 LCY <br />Source of estimated volume: 1.02 acres, 22" depth <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,1001bs/LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$98.72 <br />$100.59 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$108.19 <br />$87.23 <br />NA <br />NA <br />NA <br />NA <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$31.26 <br />$41.85 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$238.17 <br />$229.67 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$706.01 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $706.01 <br />MATERIAL OUANTITIES <br />Initial volume: 3,017 CCY Swell factor: 1.100 <br />Loose volume: 3,319 LCY <br />Source of estimated volume: 1.02 acres, 22" depth <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,1001bs/LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />