Laserfiche WebLink
Truck Cvcle Time: <br />Truck Exchange Time: 0.50 Minutes <br />Truck Load Time: 0.635 Minutes <br />Truck Maneuver and Dump 0.90 Minutes <br />Time: <br />Adjusted for site altitude <br />Adjusted for site altitude <br />Adjusted for site altitude <br />Page 60 of 135 <br />0.500 <br />Minutes <br />0.635 <br />Minutes <br />0.900 <br />Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Hard, smooth, stabilized, surfaced, watered, <br />maintained 2.0 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />(fpm) Time <br />726.60 LCY/Hour <br />Truck Unit Production <br />min <br />1 <br />8100.00 <br />1.00 <br />2.00 <br />3.00 <br />2800 <br />3.070 <br />Haul Time: 3.070 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity Travel <br />minutes <br />Loading Tool unit <br />(Ft) <br />(%) <br />(%) <br />(fpm) Time <br />726.60 LCY/Hour <br />Truck Unit Production <br />126.22 <br />min <br />104.76 LCY/Hour <br />Optimal No. of Trucks: <br />1 <br />8100.00 <br />-1.00 <br />2.00 <br />1.00 <br />2963 2.767 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 2.767 <br />minutes <br />Total Truck Cycle Time: 7.872 <br />minutes <br />Loading Tool unit <br />Production <br />875.42 <br />LCY/Hour Adjusted for job efficiency: <br />726.60 LCY/Hour <br />Truck Unit Production <br />126.22 <br />LCY/Hour Adjusted for job efficiency: <br />104.76 LCY/Hour <br />Optimal No. of Trucks: <br />7 <br />Truck(s) Selected Number of Trucks: <br />4 Truck(s) <br />Adjusted hourly truck team production: 419.05 <br />LCY/Hour <br />Adjusted single truck/loader team production: 419.05 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 419.05 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 27.46 <br />Hours <br />Unit cost: <br />$2.266 <br />/LCY Total job cost: $26,078 <br />CIRCES Cost Estimating Software <br />