Laserfiche WebLink
vj�� TR03 <br /> of cow <br /> COLORADO DIV. ac IATION, MINING AND SAFETY <br /> k"1e76"* 1313 Sherman Sn___,____._. _._, .,...,,.,.,,,.,,.ado 80203 ph(303)866-3567 <br /> RECEIVED <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET JAN 2 9 2020 <br /> File No.: M- 1 974-086 Site Name: Ralston Quarry DIVISION OF RECU11ATj <br /> MINING&SAFETY <br /> county Jefferson TR# DRMS Use only) <br /> Permittee:Asphalt Paving Co., Inc. � W4. <br /> Operator(If Other than Permittee): <br /> Ben Langenfeld 5 ° 3 <br /> Permittee Representative: o .... <br /> CD V <br /> Please provide a brief description of the proposed revision: <br /> 00 <br /> Revisions to slide repair designs and supporting slope stability analysis. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. o h <br /> Aso <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the 0 ; to <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> l 1 Oc, 11], 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 11 <br /> 110d, 112d(1, 2 or 3) $1006 M <br />