My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-28_ENFORCEMENT - M2018051 (4)
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2018051
>
2020-01-28_ENFORCEMENT - M2018051 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 4:50:14 PM
Creation date
1/28/2020 12:15:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018051
IBM Index Class Name
ENFORCEMENT
Doc Date
1/28/2020
Doc Name
Board (MLRB) Order
From
DRMS
To
Pete Kowalewski
Email Name
PSH
JLE
CMM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18. Objector Bijou Irrigation presented testimony regarding concerns that <br /> Applicant's proposed mining plan called for quarterly water quantity and quality <br /> monitoring, which Bijou Irrigation argued was not frequent enough. Bijou <br /> Irrigation also presented testimony raising concerns with Applicant's reclamation <br /> plan, arguing that the site has little top soil, is dry and prone to erosion, and that <br /> the porosity of the sand would allow any contaminants dropped during mining to <br /> affect water quality in Empire Reservoir. Bijou Irrigation suggested mitigating <br /> most of those problems by requiring Applicant to import top soil as part of the <br /> reclamation plan. <br /> 19. The Division presented testimony regarding AM-01 and its review of <br /> the permit amendment application. No acidic or toxic materials will be mined or <br /> used in processing, and the inert material proposed for use in processing by <br /> Applicant will not degrade water quality at the site. The Applicant will implement <br /> a spill prevention control and countermeasures plan and a stormwater pollution <br /> prevention plan, which includes paving roads and parking areas as well directing <br /> flows from fueling areas to a settling and treatment pond. The Applicant had <br /> satisfied all of the Division's adequacy review requests, and AM-01 satisfied the <br /> requirements of the Act and the Rules. <br /> 20. The Division recommended approving the permit amendment <br /> application AM-01 over objections. <br /> CONCLUSIONS OF LAW <br /> 21. The Board has jurisdiction over Applicant and this matter pursuant to <br /> the Act. <br /> 22. Under section 34-32.5-115(4), C.R.S., "the applicant must comply with <br /> the requirements of this article and section 24-4-105(7), C.R.S." <br /> 23. Under Rule 1.4.1(10), the Applicant "has the burden of demonstrating <br /> that the application meets the minimum requirements of the Act, Rules, and <br /> Regulations." <br /> 24. Under Rule 2.8.1(1) and section 24-4-105(7), C.R.S., "the proponent of <br /> an order shall have the burden of proof." As the party initiating this matter by <br /> filing the Application, Applicant was the "proponent of an order" at the hearing and, <br /> therefore, has the burden to prove that the Application is consistent with applicable <br /> laws and rules, and should be approved by the Board. <br /> Black Mountain Sand Weld LLC <br /> Lost Creek Mine/M-2018-051 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.