Laserfiche WebLink
� r <br /> Rocky Mountain Industrials <br /> ROCKY MOUNTAIN 4601 DTC Blvd. Suite 130 <br /> TO r <br /> ► N o u n T R ► A L s Denver,CO 80237 n <br /> January 17 2020 RECEIVED <br /> 7. <br /> JAN 2 7 2020 7. <br /> Robert Wagner NMM <br /> Rocky Mountain Industrials DIVISION OF RECLAMATION <br /> 4601 DTC Blvd. Suite 130 MINING&SAFETY <br /> Denver, CO 80237 <br /> Amy Yeldell <br /> CO DRMS <br /> 1313 Sherman St. Room 215 <br /> Denver, CO 80203 <br /> RE: Quarterly Update on Mid-Continent Quarry BLM Plan of Operations Modification <br /> Dear Ms.Yeldell, <br /> This letter serves as the Mid-Continent Quarry BLM Plan of Operations Modification quarterly update <br /> from Rocky Mountain Industrials (RMI)to the Colorado Division of Reclamation, Mining, and Safety (CO <br /> DRMS) for the period of October 1, 2019 to December 31, 2019. During the fourth quarter of 2019, RMI <br /> finalize its request for permission to drill five hydrology baseline monitoring wells and submitted it to <br /> the BLM. Permission to conduct the baseline monitoring was not yet granted in the fourth quarter of <br /> 2019.The baseline data gathered from the hydrology study will be used in the NEPA process for the Plan <br /> of Operations Modification. <br /> Please let me know if you require additional information for this quarterly update. <br /> Sincerely+T/ . <br /> Robert T. Wagner <br /> VP, Engineering <br /> Rocky Mountain Industrials <br /> rwagner@rockvmountainindustrials.com <br /> 1 <br />