My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-28_REPORT - C1981018
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981018
>
2020-01-28_REPORT - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 12:02:37 PM
Creation date
1/28/2020 11:09:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Report
Doc Date
1/28/2020
Doc Name
Subsidence Monitoring Report
From
Blue Mountain Energy
To
DRMS
Annual Report Year
2019
Report Quarter_Month
4
Permit Index Doc Type
Subsidence Report
Email Name
CCW
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blue Mountain Energy, Inc. - Deserado Mine <br /> Quarterly Sediment Pond Inspection Report <br /> Fourth Quarter 2019 <br /> Inspector: Kurtis Blunt-Sr.Environmental Engineer <br /> _Operational Status <br /> Type of Approx Sediment Outflow H,0 Samp. <br /> Ponds Name Description Date H,0 Level% Level% Yes No Yes No Comments <br /> Sed Ponds DP-1 D-Portal 11/7 100 45 X X <br /> " RP-1 Refuse Area 1 11/7 0 10 X X <br /> " RP-2/3 Refuse Area 2/3 11/7 0 15 X X <br /> RP-4 Refuse Area 4 11/7 0 30 X X <br /> " RP-5 Refuse Area 5A 11/7 0 25 X X <br /> " RR-1 Railroad Fill Slope Pond 1 11/7 0 5 1 X X <br /> 7 RRS Railroad Loadout Washdown Sump 11/7 0 5 X X <br /> 8 SS-1 Slot Storage Building Access Road Pond 11/7 0 10 X X <br /> 9 SS-2 Slot Storage Biding Emerg.Coal Storage Area Pond 11/7 0 6 X X <br /> 10 HSL-1 Halandras Sanitary Land Fill Pond 11/7 0 5 X X <br /> it SDH-2U Down Hole Sump Upper Influent Pond inactive inactive 5 X X Shut off 2/96 due to mine sealing <br /> 12 SDH-2L Down Hole Sump Lower Effluent Pond inactive inactive 5 X X Shut off 2/96 due to mine sealing <br /> 13 SDH-3L Down Hole Sump Discharge 2-Lower 11/7 90 10 X X Pumping restarted late November 2017 <br /> 14 SDH-3M Down Hole Sump Discharge 2-Middle 11/7 0 0 X X New 10/2015 <br /> 15 SDH-3U Down Hole Sump Discharge 2-Upper 11/7 0 0 X X New 10/2015 <br /> 16 TS-1 Transfer Building 1 11/7 0 20 X X <br /> 17 TS-2 Transfer Building 2 11/7 0 20 X X 3 <br /> 18 TS-2a Temp Coal Storage by Transfer 2 11/7 0 5 X I X <br /> 19 BD-1 B-Dewatering Pond#1 11/7 90 40 X X Outflow weekly <br /> 20 BD-2 B-Dewatering Pond#2 11/7 95 25 X X Outflow weekly <br /> 21 BD-3 B-Dewatering Pond#3 11/7 95 0 X X Outflow weekly <br /> 22 BD-4 B-Dewatering Pond#4 11/7 95 0 X X Outflow weekly <br /> 23 BD-5 B-Dewatering Pond#5 11/7 95 0 X X Outflow weekly <br /> 24 BD-6 B-Dewatering Pond#6 11/7 95 0 X X Outflow weekly <br /> 25 BD-7 B-Dewatering Pond#7 11/7 95 0 X X Outflow weekly <br /> 26 BD-LC B-Dewatering Last Chance Pond 11/7 95 0 X X Outflow weekly <br /> 27 BD2-3 BD2-Dewatering Pond#3(lower large pond) 11/7 20 0 X X <br /> 28 BD2-4 BD2-Dewatering Pond#4(discharge pond) 11/7 0 0 X X <br /> N32 <br /> BD2-5 BD2-Dewatering Pond#5(initial small pond) 11/7 0 5 X X <br /> Proc Pond PP-1 Prep Plant Process Pond 11/7 40 20 X X <br /> PP-2 Prep Plant Process Pond 11/7 25 50 X X <br /> RW-1 Raw Water Lagoon @ White River il/7 300 25 X X Freshwater storage pumped from river <br />
The URL can be used to link to this page
Your browser does not support the video tag.