Laserfiche WebLink
January 22,2020 C-1994-082/Yoast Mine RAR <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> R -Air Resource Protection R - Roads <br /> R -Availability of Records R - Reclamation Success <br /> N -Backfill& Grading N - Revegetation <br /> Y -Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> R -Hydrologic Balance R - Signs and Markers <br /> R - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> N -Processing Waste N - Topsoil <br /> COMMENTS <br /> This was a complete inspection of the Yoast Mine, C 1994082,operated by Seneca Property LLC. The inspection <br /> was conducted, and the report prepared by me,Robin Reilley of the DRMS. Miranda Kawcak representative of <br /> Seneca Coal Co.was present throughout the inspection. The weather was cloudy with temperatures ranging in the <br /> 30 degrees F. There was fresh snow and since roads are not plowed,the site was circumnavigated on the county <br /> road and ponds along the road were observed. <br /> UPCOMING PERMITTING ACTIONS: <br /> 1. Vegetation sampling for year two Phase III will occur during the summer of 2019 for a 2020 bond release. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Main haul roads were snow and impassable throughout the site. No offsite air quality issues or hydrologic impacts <br /> were observed at the time of inspection. Reclamation visible from the county road appeared stable. Observable <br /> ponds appeared to be functioning adequately. <br /> SIGNS and MARKERS—Rule 4.02 <br /> o The mine site identification signs observed were intact,displaying all required information. <br /> ROADS Rule 4.03 Construction 4.03.1(3), 4.03.2(3);Drainage 4.03.1(4), 4.03.2(4); Surfacing and <br /> Maintenance 4.03.1(5)and(6) 4.03.2(5) and(6). <br /> o Roads in and around the facilities were snow covered and impassable. <br /> HYDROLOGIC BALANCE-Rule 4.05 <br /> General Requirements 4.05.1; Effluent Standards 4.05.2; Divergence and Conveyance of Overland <br /> Flow 4.05.3;Diversions 4.05.4; Sediment Control Measures 4.05.5, 4.05.6; Discharge Structures 4.05.7 <br /> Impoundments 4.05.9; Ground Water Monitoring 4.05.13; Underground Mine Entry 4.05.10; <br /> Surface and Ground Water Monitoring 4.05.13;Stream Buffer Zones 4.05.18: <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 2 of 6 <br />