My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-27_PERMIT FILE - M2020002
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020002
>
2020-01-27_PERMIT FILE - M2020002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 3:15:02 PM
Creation date
1/27/2020 2:32:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020002
IBM Index Class Name
PERMIT FILE
Doc Date
1/27/2020
Doc Name
Completeness Response
From
ARY Corp.
To
DRMS
Email Name
DC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. That in the event there is damage from the use of County Roads in the <br /> Haul Route for the hauling or moving of goods, equipment, or materials, those parties <br /> responsible for such damage are held accountable. <br /> c. That dust control on the County Roads shall be maintained by the <br /> Company. <br /> d. That an acknowledged speed limit will be enforced on those Roads in the <br /> Haul Route. <br /> e. That regularly scheduled weekly inspections will be conducted by the <br /> Company and the Lincoln County Road Supervisor. <br /> 2. DEFINITIONS OF TERMS USED IN THIS AGREEMENT. The following <br /> definitions shall or may be relevant for this Agreement: <br /> "Appurtenance" means a sidewalk, ditch, or any type of wall, fence guardrail, <br /> curb, pavement marking, traffic control device, illumination device or barrier adjacent to <br /> or in, along or on a County Road, or any construction, obstruction, erection or any <br /> situation, arrangement, or disposition of any earth, rock, tree, or other material or thing <br /> adjacent to or in, along,or on a road that is not the traveled portion of the road. <br /> "Company" means A&S Construction Co., and all of its agents, affiliates, <br /> employees,contractors,subcontractors,vendors and suppliers <br /> "County Road or Road" means a roadway under the direction, control, and <br /> management of the County, including (1) a developed road on which improvements <br /> such as grading or surfacing have been made for the purpose of public access and <br /> included any Appurtenance, and including any bridge forming part of a County road and <br /> any structure incidental to a County or public road, and (2) an undeveloped surveyed <br /> road allowance or road plan, including primary, secondary, and secondary un- <br /> maintained roads as identified on the Lincoln County Road Map. <br /> "Haul Route"means those roads identified in the map submitted by the Company <br /> and agreed to by the County as to those County Roads to be used by the Company to <br /> move or haul goods, equipment, and materials used in the Project. The map, attached <br /> hereto and identified as Exhibit A, may be updated from time to time by mutual <br /> agreement of the parties,and if so updated,shall be attached as a new Exhibit A. <br /> 3. TERM. This Agreement shall commence upon the date that both parties <br /> have signed this Agreement, hereinafter referred to as the "Effective Date". The <br /> Company represents that construction of the Project in Lincoln County shall be <br /> completed no later than eighteen (18) months from the date of this agreement. Either <br /> party may terminate this Agreement upon thirty(30)days written notice being given to <br /> -2- <br /> ActiveUS 175104252v.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.