My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-27_GENERAL DOCUMENTS - M1982121 (2)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1982121
>
2020-01-27_GENERAL DOCUMENTS - M1982121 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 6:28:17 AM
Creation date
1/27/2020 2:00:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982121
IBM Index Class Name
General Documents
Doc Date
1/27/2020
Doc Name
Quarterly update on Mid- Continent Quarry
From
Rocky Mountain Industrials
To
DRMS
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^�� Rocky Mountain Industrials <br /> ROCKY MOUNTAIN 4601 DTC Blvd. Suite 130 <br /> INDUSTRIALS Denver,CO 80237 <br /> January 17, 2020 RECEIVED <br /> JAN 2 7 2020 <br /> Robert Wagner <br /> Rocky Mountain Industrials DIVISION OF RECLAMATION <br /> 4601 DTC Blvd. Suite 130 MINING&SAFETY <br /> Denver, CO 80237 <br /> Amy Yeldell <br /> CO DRMS <br /> 1313 Sherman St. Room 215 <br /> Denver, CO 80203 <br /> RE:Quarterly Update on Mid-Continent Quarry BLM Plan of Operations Modification <br /> Dear Ms.Yeldell, <br /> This letter serves as the Mid-Continent Quarry BLM Plan of Operations Modification quarterly update <br /> from Rocky Mountain Industrials (RMI)to the Colorado Division of Reclamation, Mining, and Safety (CO <br /> DRMS)for the period of October 1, 2019 to December 31, 2019. During the fourth quarter of 2019, RMI <br /> finalize its request for permission to drill five hydrology baseline monitoring wells and submitted it to <br /> the BLM. Permission to conduct the baseline monitoring was not yet granted in the fourth quarter of <br /> 2019.The baseline data gathered from the hydrology study will be used in the NEPA process for the Plan <br /> of Operations Modification. <br /> Please let me know if you require additional information for this quarterly update. <br /> Sincerely, <br /> Calt1277 0 <br /> Robert T.Wagner <br /> VP, Engineering <br /> Rocky Mountain Industrials <br /> rwagner@rockymountainindustrials.com <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.