My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-24_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-01-24_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 4:36:55 PM
Creation date
1/24/2020 3:31:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/24/2020
Doc Name
Request for Technical Revision
From
CC&V
To
DRMA
Type & Sequence
TR120
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Timm Comer <br /> Manager,Environmental Resources ameO <br /> Hydro-JexTM Program Review <br /> December 17,2009 <br /> Safety Factor <br /> 0.00 <br /> 0.25 <br /> 0.50 <br /> 0.'15 <br /> 1.00 <br /> T 1.25 <br /> 1.50 <br /> 1.75 <br /> 2.00 <br /> 2.25 <br /> 2.50 <br /> 2.75 <br /> 3.00 <br /> 3.25 <br /> 3.50 <br /> 3.75 <br /> 4.00 <br /> 4.25 <br /> 4.50 <br /> 4.75 1.62 <br /> 5.00 \ <br /> 5.25 <br /> 5.50 <br /> 5.7.1 \ <br /> 6.00. \ <br /> \ <br /> 41500 42000 42500 43000 435W �l 44000 � 44500 45 <br /> Figure 14 9810 Stability Analysis <br /> It is also recommended that conditions in and around the ore heap be closely monitored during the <br /> injection tests. Injection should be terminated at the sign of any instability, such as the formation of <br /> seepage faces on the ore slopes, excessive surface cracking or displacement, and/or erratic injection <br /> pressures. <br /> Please note that, based on observations at other sites, it is very likely that local settlement may occur <br /> near or around the injection wells. This occurs because the effective stress within the ore column <br /> changes under high-pressure injection, resulting in compaction of the ore. The amount of anticipated <br /> settlement is not considered significant, however it should be monitored. <br /> If you have any questions or comments, please contact me at(303)433-0262. <br /> Sincerely, <br /> AMEC Earth & Environmental, Inc. <br /> n F. Lupo, Ph.D., P.E. = "a <br /> Principal Engineer <br /> rr <br /> .'409" <br /> / otLe <br /> At <br /> SAPROJECT511125E CCV COA\e-correspondence\hydro iex letler.doc 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.