My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-24_GENERAL DOCUMENTS - M1978039HR
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1978039
>
2020-01-24_GENERAL DOCUMENTS - M1978039HR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 6:17:29 AM
Creation date
1/24/2020 3:15:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978039HR
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/24/2020
Doc Name
Correspondence
From
Pinon Ridge Mining
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pinon Ridge Mining LLC <br /> 31161 Highway 90, PO Box 825 <br /> Nucla, Colorado 81424 <br /> January 17, 2020 <br /> r. Lucas West, Environmental Protection Specialist <br /> JAN 2 4 2020 <br /> Colorado Division of Reclamation, Mining and Safety DVVISION OF RECLAMATION <br /> 1313 Sherman Street, Room 215 MINING&SAFETY <br /> Denver, CO 80203 <br /> Transmittal: Constructing Ore pads: Sunday Mine Complex <br /> Sunday Mine (Permit M-1977-285), <br /> St. Jude Mine (Permit M-1978-039HRr), <br /> West Sunday Mine (Permit M-1981-021) <br /> Dear Mr. West: <br /> Pinon Ridge Mining LLC (PRM) is submitting a letter to inform you that we will be <br /> constructing three ore pads at the Sunday Mine Complex, which includes the Sunday <br /> Mine, St. Jude Mine, and the West Sunday Mine, per the (EPP) ENVIRONMENTAL <br /> PROTECTION PLAN January, 2012, Section 6.1 and Attachment S. <br /> Construction on the ore pads is tentatively scheduled to begin on Thursday, January <br /> 23rd and will require approximately 4 weeks to complete. AMC Excavation LLC will be <br /> constructing the pads and Trautner Geotech LLC will be responsible for quality control <br /> sampling and testing. David Ballode, PE of Uncompahgre Engineering LLC will oversee <br /> the work and prepare a completion letter report that will be submitted to the Division of <br /> Reclamation, Mining and Safety and the Bureau of Land Management. Please give me <br /> a call if you have any questions or would like to visit the project site during pad <br /> construction. <br /> Sincerely, <br /> PINON RIDGE MINING LLC <br /> Mike Rutter <br /> Vice President, Operations <br /> CC: James Blair, Bureau of Land Management <br /> George Glasier, Pinon Ridge Mining <br /> Frank Filas, Filas Engineering <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.