My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-24_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2020-01-24_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 4:36:41 PM
Creation date
1/24/2020 9:30:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/24/2020
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
MR213
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 6 <br /> BULLDOZER WORK <br /> Task description: Regrade TS at Collom Dewatering Well 6- 10 and Piez 4 and 5 <br /> Site: Colowyo Coal Mine Permit Action: MR213 Permit/Job#: C 1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 1/24/2020 County: Moffat Filename: C019-001 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 1-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $103.86 NA <br /> Operating Cost/Hour: $82.26 100 <br /> Ripper own. $13.90 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $8.74 100 <br /> Operator Cost/Hour: $41.24 NA <br /> Total unit Cost/Hour: $249.99 <br /> Total Fleet Cost/Hour: $249.99 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 4,986 <br /> Swell factor: 1.000 <br /> Loose volume: 4,986 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 200 feet <br /> Unadjusted hourly 491.9 LCY/hr <br /> production: <br /> Materials consistency Partly consolidated stockpile 1.1 <br /> description: <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 7,600 feet <br /> Material weight: 1,600 lbs/LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.