Laserfiche WebLink
2.03.8 - PERMIT TERM INFORMATION <br /> The anticipated start of each phase of mining activities is discussed in Section 2.05.2 <br /> and 2.05.3 Operations Plan. <br /> The term of the permit shall be for five (5) years from issuance, renewable under the <br /> terms of Rule 2.08.5. <br /> The current extent of areas affected by this permit, the anticipated number of acres <br /> to be affected during the 5 year term of this permit, and the anticipated number of <br /> acres to be affected during the total life of the permit is listed in the following table: <br /> 5 Year Life of <br /> Location Approved Additional Operation <br /> Areas Additional <br /> King I Surface Facilities (Disturbed 24.25 Acres + 0 Acres + 0 Acres <br /> Area <br /> King II Surface Facilities (Disturbed 23.06 Acres + 0 Acres + 0 Acres <br /> Area <br /> TR-22 Drill Holes Disturbed Area 2.1 Acres + 0 Acres + 0 Acres <br /> MR-49 Drill Hole Disturbed Area 0.8 Acres + 0 Acres + 0 Acres <br /> TR-26 Monitoring Wells Disturbed Area 1.0 Acres + 0 Acres + 0 Acres <br /> Total Disturbed Area 51.21 Acres + 0 Acres + 0 Acres <br /> King I Affected Area 1397.48 + 0 Acres + 0 Acres <br /> Acres <br /> King II Affected Area 260.87 Acres + 0 Acres + 0 Acres <br /> TR-22 Drill Holes Affected Area 1.10 Acres + 0 Acres + 0 Acres <br /> Total Affected Area 1659.45 <br /> Acres <br /> Total Permit Area (prior to TR-24) 2615.8 Acres + 0 Acres + 0 Acres <br /> Total Permit Area (including TR-24 2705.4 Acres + 0 Acres + 0 Acres <br /> angle-of-draw adjustments <br /> In January, 2009, the King I mine was permanently sealed. The final mine map <br /> revealed areas where the potential affected areas lie outside of the permit boundary <br /> (due to potential angle-of-draw) as shown at the time. To reflect that change, the <br /> permit boundary has been revised with the submittal of TR-24 to show an increased <br /> permit area of 89.60 acres. No actual disturbance due to subsidence has ever been <br /> noted outside of the previous extents of the permit boundary. The following table <br /> provides percentages of surface and mineral ownership with respect to the expanded <br /> 89.60 acre permit area. <br /> Surface Ownership Mineral Ownership <br /> Federal 0 % 63.76% 57.13 Acres <br /> State 0 % 0 % <br /> Private 100 % 89.60 Acres 36.24% 32.47 Acres <br /> GCC Energy, LLC King II Mine <br /> Section 2.03.8 <br /> Page 1 January 15, 2020 (MR-50 PAR) <br />