My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-17_PERMIT FILE - C1981035A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2020-01-17_PERMIT FILE - C1981035A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 3:34:58 PM
Creation date
1/23/2020 7:33:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
1/17/2020
Section_Exhibit Name
KI 2.03.8 Permit Term Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-27 has been submitted to create a Lower Refuse Pile in an area of the <br /> existing, previously disturbed, lower yard area of the King I mine site. This area will be <br /> used primarily as a refuse pile to be used during the winter months due to the dangers <br /> and difficulties of hauling refuse to the existing Refuse Pile. In addition, the overall <br /> appearance of the "pre-law" King I site will be improved with the re-contouring of the <br /> lower yard as proposed in TR-27. <br /> An engineering design and report has been prepared by Stoner Engineering of <br /> Cortez, Colorado and is included in this permit application package as Appendix 10(4). <br /> This engineering report refers to Maps King I-007 and King I-007A of this permit <br /> application package. Stoner Engineering has been performing engineering tasks and <br /> inspecting the King I and King II mine sites for many years and is well qualified for this <br /> type of design. <br /> In preparation of the report for the TR-27 submittal, Stoner Engineering <br /> requested a geotechnical evaluation by Trautner Geotech, LLC (Consulting <br /> Geotechnical Engineers and Material Testing) of the King II mine materials currently <br /> being deposited on the existing King I Refuse Pile. The Trautner Geotech report can be <br /> found in this permit application package as Appendix 10(4A). The material as tested <br /> will be the same material which will be deposited to construct the Lower Refuse Pile. <br /> This material has been determined to be suitable for the proposed use. <br /> GCC Energy, LLC King I Mine <br /> Section 2.05.3 <br /> Page 2A November 27, 2018 (TR-27) <br />
The URL can be used to link to this page
Your browser does not support the video tag.