Laserfiche WebLink
EC-1 Surface Roughening (SR) <br /> SURFACE ROUGHENING INSTALLATION NOTES <br /> 1. SEE PLAN VIEW FOR: <br /> —LOCATIONS) OF SURFACE ROUGHENING. <br /> 2 SURFACE ROUGHENING SHALL BE PROVIDED PROMPTLY AFTER COMPLETION OF FINISHED <br /> GRADING (FOR AREAS NOT RECEIVING TOPSOIL) OR PRIOR TO TOPSOIL PLACEMENT OR ANY <br /> FORECASTED RAIN EVENT. <br /> 3. AREAS WHERE BUILDING FOUNDATIONS, PAVEMENT, OR SOD WILL BE PLACED WITHOUT <br /> DELAY IN THE CONSTRUCTION SEQUENCE, SURFACE ROUGHENING IS NOT REQUIRED. <br /> 4. DISTURBED SURFACES SHALL BE ROUGHENED USING RIPPING OR TILLING EQUIPMENT ON <br /> THE CONTOUR OR TRACKING UP AND DOWN A SLOPE USING EQUIPMENT TREADS. <br /> 5 A FARMING DISK SHALL NOT BE USED FOR SURFACE ROUGHENING. <br /> SURFACE ROUGHENING MAINTENANCE NOTES <br /> 1. INSPECT BMPS EACH WORKDAY, AND MAINTAIN THEM IN EFFECTIVE OPERATING CONDITION. <br /> MAINTENANCE OF BMPs SHOULD BE PROACTIVE, NOT REACTIVE. INSPECT BMPS AS SOON AS <br /> POSSIBLE (AND ALWAYS WITHIN 24 HOURS) FOLLOWING A STORM THAT CAUSES SURFACE <br /> EROSION, AND PERFORM NECESSARY MAINTENANCE, <br /> 2. FREQUENT OBSERVATIONS AND MAINTENANCE ARE NECESSARY TO MAINTAIN BMPS IN <br /> EFFECTIVE OPERATING CONDITION. INSPECTIONS AND CORRECTIVE MEASURES SHOULD BE <br /> DOCUMENTED THOROUGHLY. <br /> 3, WHERE BMPS HAVE FAILED, REPAIR OR REPLACE UPON DISCOVERY OF THE FAILURE. <br /> 4. VEHICLES AND EQUIPMENT SHALL NOT BE DRIVEN OVER AREAS THAT HAVE BEEN SURFACE <br /> ROUGHENED. <br /> 5, IN NON—TURF GRASS FINISHED AREAS, SEEDING AND MULCHING SHALL TAKE PLACE <br /> DIRECTLY OVER SURFACE ROUGHENED AREAS WITHOUT FIRST SMOOTHING OUT THE SURFACE <br /> 6. IN AREAS NOT SEEDED AND MULCHED AFTER SURFACE ROUGHENING. SURFACES SHALL BE <br /> RE—ROUGHENED AS NECESSARY TO MAINTAIN GROOVE DEPTH AND SMOOTH OVER RILL <br /> EROSION. <br /> (DETAILS ADAPTED FROM TOWN OF PARKER. COLORADO. NOT AVAILABLE IN AUTOCAD) <br /> NOTE: MANY JURISDICTIONS HAVE BMP DETAILS THAT VARY FROM UDFCD STANDARD DETAILS. <br /> CONSULT WITH LOCAL JURISDICTIONS AS TO WHICH DETAIL SHOULD BE USED WHEN <br /> DIFFERENCES ARE NOTED <br /> SR-4 Urban Drainage and Flood Control District November 2010 <br /> Urban Storm Drainage Criteria Manual Volume 3 <br />