My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-21_PERMIT FILE - M2019046
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019046
>
2020-01-21_PERMIT FILE - M2019046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 2:59:25 AM
Creation date
1/21/2020 2:31:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019046
IBM Index Class Name
Permit File
Doc Date
1/21/2020
Doc Name
Adequacy Review Response
From
Greg Lewicki & Associates
To
DRMS
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Surface Roughening (SR) EC-1 <br /> Description <br /> Surface roughening is an erosion control _ <br /> practice that involves tracking, <br /> scarifying, imprinting,or tilling a <br /> disturbed area to provide temporary - <br /> stabilization of disturbed areas. Surface <br /> roughening creates variations in the soil <br /> surface that help to minimize wind and <br /> r <br /> water erosion. Depending on the <br /> technique used, surface roughening may <br /> also help establish conditions favorableto establishment of vegetation. 74000 <br /> vAO <br /> Appropriate Uses <br /> Surface roughening can be used to Photograph SR-1. Surface roughening via imprinting for temporary <br /> provide temporary stabilization of stabilization. <br /> disturbed areas, such as when <br /> revegetation cannot be immediately established due to seasonal planting limitations. Surface roughening <br /> is not a stand-alone BMP,and should be used in conjunction with other erosion and sediment controls. <br /> Surface roughening is often implemented in conjunction with grading and is typically performed using <br /> heavy construction equipment to track the surface. Be aware that tracking with heavy equipment will also <br /> compact soils,which is not desirable in areas that will be revegetated. Scarifying,tilling,or ripping are <br /> better surface roughening techniques in locations where revegetation is planned. Roughening is not <br /> effective in very sandy soils and cannot be effectively performed in rocky soil. <br /> Design and Installation <br /> Typical design details for surfacing roughening on steep and mild slopes are provided in Details SR-1 and <br /> SR-2, respectively. <br /> Surface roughening should be performed either after final grading or to temporarily stabilize an area <br /> during active construction that may be inactive for a short time period. Surface roughening should create <br /> depressions 2 to 6 inches deep and approximately 6 inches apart. The surface of exposed soil can be <br /> roughened by a number of techniques and equipment. Horizontal grooves(running parallel to the <br /> contours of the land)can be made using tracks from equipment treads, stair-step grading,ripping,or <br /> tilling. <br /> Fill slopes can be constructed with a roughened surface. Cut slopes that have been smooth graded can be <br /> roughened as a subsequent operation. Roughening should follow along the contours of the slope. The <br /> tracks left by truck mounted equipment working perpendicular <br /> to the contour can leave acceptable horizontal depressions; Surface Roughening <br /> however,the equipment will also compact the soil. Functions <br /> Erosion Control Yes <br /> Sediment Control No <br /> Site/Material Management No <br /> November 2010 Urban Drainage and Flood Control District SR-1 <br /> Urban Storm Drainage Criteria Manual Volume 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.