My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-21_PERMIT FILE - M2019046
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019046
>
2020-01-21_PERMIT FILE - M2019046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 2:59:25 AM
Creation date
1/21/2020 2:31:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019046
IBM Index Class Name
Permit File
Doc Date
1/21/2020
Doc Name
Adequacy Review Response
From
Greg Lewicki & Associates
To
DRMS
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Affidavit for Import of Materials into the Bradford Mesa Quarry <br /> Inert material imports, as defined by Rule 1.1(22) of DBMS Construction Materials Rules and <br /> Regulations (effective July 15, 2019), may include: <br /> "non-water soluble and non-putrescible solids together with such minor amounts and <br /> types of other materials, unless such materials are acid or toxic producing, as will not <br /> significantly affect the inert nature of such solids. The term includes, but is not limited to, <br /> earth, sand, gravel, rock, concrete which has been in a hardened state for at least sixty <br /> (60) days, masonry, asphalt paving fragments, and other inert solids." <br /> I hereby certify that material brought to the Bradford Mesa Quarry is inert, as defined above, <br /> which means it is free from any chemicals, toxic substances, acid forming material, or any other <br /> material that would violate the material waste disposal laws of the State of Colorado. I hereby <br /> certify that only the inert materials listed above may be imported to the Bradford Mesa Quarry. <br /> A4�*?p JAZP Alonzo Salazar <br /> T - - <br /> Signature Written Name of Signer <br /> Vice President Southway Construction Company, Inc. of Alamosa <br /> Signer's Position in Company Company <br /> Bate: January 15, 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.