affidavit of import is included in this exhibit. The importer,the Operator, also certifies that all <br /> imported materials are clean and inert, see the executed affidavit certifying all imported materials <br /> are inert at the end of the this exhibit. <br /> Additionally, certified inert concrete and asphalt may be imported to the site and used as the base <br /> layers of backfilling. This is advantageous because inert concrete and asphalt will be used to <br /> make up for the limited overburden expected to be recovered from the site. All exposed rebar <br /> will be either removed from the concrete it's held within or will be buried by at least 3 feet of <br /> acceptable fill material. See the enclosed example affidavit of import and a signed affidavit by <br /> the Operator certifying imported material is inert. <br /> Bradford Mesa Quarry <br /> January 2020 E-4 <br />