Laserfiche WebLink
tp <br /> Bradford Mesa Dump Slope Design <br /> oContemporaneous Reclamation with an Overall Final Slope 3H:1V <br /> Dump to <br /> Mining Slope Safety and Stormwater Berm <br /> tO <br /> Q <br /> 3 0 feet <br /> 2 5 feet /x <br /> 5 feet <br /> Push to Final Reclamation Slope <br /> Upper Wedge �\ <br /> dozer pushed to ` _ __ Seeded <br /> Wedge <br /> Lower <br /> d g �6y.� Stormwater <br /> Topsoil & Seeded V Berm <br /> Reclamation Slope <br /> Figure 4. Schematic typical cross-section of the Bradford Mesa Dump Slope Design. <br /> 5 <br />