My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-17_REPORT - C2010088
DRMS
>
Day Forward
>
Report
>
Coal
>
C2010088
>
2020-01-17_REPORT - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 6:11:43 AM
Creation date
1/21/2020 7:38:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Report
Doc Date
1/17/2020
Doc Name
Annual Hydrology Report Adequacy Review
From
DRMS
To
J.E. Stover and Associates
Annual Report Year
2019
Permit Index Doc Type
Hydrology Report
Email Name
CCW
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LRAC <br /> Division of Reclamation, <br /> WTM Mining and Safety <br /> Department of Natural Resources <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> January 17, 2020 <br /> Tamme Bishop <br /> J.E. Stover and Associates <br /> 2352 N 7th Street, Unit B <br /> Grand Junction, CO 81501 <br /> RE: Fruita Loadout, C-2010-088 <br /> 2019 Annual Hydrology Report Review <br /> Dear Tamme, <br /> The Division of Reclamation, Mining and Safety(the Division)has completed the review of the <br /> 2019 Annual Hydrology Report(AHR) for the Fruita Loadout. The report was received by the <br /> Division on January 15, 2020, thank you for your timely submittal. The Division finds the 2019 <br /> AHR to be in compliance with the following Rules: <br /> Rule 4.05.13(1), (2), (3) and(4), the approved Permit Application Package and the Probable <br /> Hydrologic Consequences (PHQ. During the calendar year of 2019 no surface disturbances <br /> were created at the Fruita Loadout. With the approval of TR-1 (Technical Revision No. 1) on <br /> October 10, 2012, all water monitoring was suspended. The TR was approved due to the <br /> construction at the loadout being delayed until the McClane Canyon Mine (MCM) obtains a <br /> sales contract or another mine shows interest in using the loadout. There was no consumptive <br /> water use during 2019 and no discharge from the site occurred. <br /> This concludes the Division's review of the 2019 Annual Hydrology Report for the Fruita <br /> Loadout. If you have any questions,please contact me at(303)-866-3567 x8144. <br /> Sincerely, <br /> %* ok <br /> Clayton Wein <br /> Environmental Protection Specialist <br /> clayton.weingstate.co.us <br /> -'pF•COl <br /> c„ < 01 <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 htt /mining.state.co.us <br /> Jared S. Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director �, l876*, <br />
The URL can be used to link to this page
Your browser does not support the video tag.