My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-17_REVISION - M1999004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999004
>
2020-01-17_REVISION - M1999004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 4:29:16 PM
Creation date
1/17/2020 1:00:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999004
IBM Index Class Name
Revision
Doc Date
1/17/2020
Doc Name
Request for Technical Revision
From
Tezak Heavy Equipment Co.
To
DRMS
Type & Sequence
TR2
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04 COO <br /> COLORADO DIVISI T R 02 ,ION, MINING AND SAFETY <br /> *8*1876 1313 Sherman Street,' TC1/mac 80203 ph(303)866-3567 <br /> � <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> 1999-004 .Table Mtn. QuarryJAB 1 � ��xA <br /> File No.: M- Site Name. -AANATION <br /> Fremont MINING&SAFETY <br /> County TR# ORMS Use only) <br /> Permittee:Tezak Heavy Equipment Co., Inc. <br /> Operator(If Other than Permittee):Same as Permittee <br /> .r <br /> Permittee Representative: Randy D(Luzlo LAN 1 <br /> Please provide a brief description of the proposed revision: I <br /> Total bond calculation and revision of Exhibit L, Reclamation Cost Estimate: Increase of <br /> allowable disturbance area to a maximum of 50 acres. <br /> � 00 <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application 3 <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or o�. <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted to <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, @ b <br /> the Division may require the submittal of a permit amendment to make the required or desired changes ; p <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the c <br /> permittee requests additional time, in writing,to provide the required information. n IS <br /> o h <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide °_ O <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(l, 2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.