Laserfiche WebLink
Loader Worksheet Cont'd Task#001 Page 2 of 2 <br /> Total Travel Time: 0.0476 minutes <br /> Total Cycle Time: 0.4726 minutes <br /> Load Bucket Ca a�city_ <br /> Rated Capacity: 0.53 LCY(heaped) <br /> Bucket Fill Factor: 1.100 Other-rock/dirt mixtures (100-1201/o)1.100 <br /> Adjusted Capacity: 0.58 LCY <br /> Job Condition Correction Factors <br /> Site Altitude:6500 feet <br /> Source <br /> Altitude Adj: 1.00 CAT HB <br /> Job Efficiency: 0.83 (1 sbi8/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: 74.02 LCY/Hour <br /> Adjusted Hourly Unit Production: 61.44 LCY/Hour <br /> Adjusted Hourly Fleet Production: 61.44 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 1.58 Hours <br /> Unit cost: $1.084 /LCY Total job cost: $105 <br /> CIRCES Cost Estimating Software <br />