Laserfiche WebLink
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4(Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E-Map. <br /> 1) Primary future(Post-mining)land use (check one): <br /> Cropland (CR) _a Pastureland(PL) F-1 General Agriculture (GA) <br /> Rangeland(RL) 00' Forestry (FR) Wildlife Habitat(WL) <br /> Residential(RS) _a Recreation (RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> We plan on filling our ditch back in with the dirt that we dig out in front of us and we plan on planting <br /> grass and small sapling trees on the area where we dug. <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 1 H: 1 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: 1 V(example 1 H:1 V,2H: 1 V, etc.), please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> We plan on backfilling our ditch with the dirt that we dig out in front of us. <br /> 4) De th of topsoil to be salvaged(only for surface disturbances) (check one): <br /> 4-6 inches =6-8 inches <br /> 8-10 inches F-1 10-12 inches <br /> ✓ Other: 5-10 feet <br /> N/A, explain: <br />