My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-09_PERMIT FILE - M2019055
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019055
>
2020-01-09_PERMIT FILE - M2019055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 4:16:26 PM
Creation date
1/10/2020 2:32:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019055
IBM Index Class Name
PERMIT FILE
Doc Date
1/9/2020
Doc Name
Application
From
James & Yvette Downing
To
DRMS
Email Name
ERR
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4(Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E-Map. <br /> 1) Primary future(Post-mining)land use (check one): <br /> Cropland (CR) _a Pastureland(PL) F-1 General Agriculture (GA) <br /> Rangeland(RL) 00' Forestry (FR) Wildlife Habitat(WL) <br /> Residential(RS) _a Recreation (RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> We plan on filling our ditch back in with the dirt that we dig out in front of us and we plan on planting <br /> grass and small sapling trees on the area where we dug. <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 1 H: 1 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: 1 V(example 1 H:1 V,2H: 1 V, etc.), please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> We plan on backfilling our ditch with the dirt that we dig out in front of us. <br /> 4) De th of topsoil to be salvaged(only for surface disturbances) (check one): <br /> 4-6 inches =6-8 inches <br /> 8-10 inches F-1 10-12 inches <br /> ✓ Other: 5-10 feet <br /> N/A, explain: <br />
The URL can be used to link to this page
Your browser does not support the video tag.